Καθυστερήσεις τεχνικών έργων | Delays of technical projects | Κρίσιμες δραστηριότητες | Critical activities | Kατηγοριοποίηση καθυστερήσεων | Categorization of delays | Ιδιοκτήτης και ανάδοχος του έργου | Owner and contractor of the project | Ευθύνη καθυστέρησης | Legal delay responsibility
3
29
Figure 1: The 7 S of project management 9
Figure 2: Cost and staffing levels across a generic Project life cycle
Figure 3: Impact of variables based on project time
Figure 4: The scope triangle (Wysocki, 2009)
Figure 5: Project time management groups
Figure 6: Example of project overview statement
Figure 7 House project WBS Subdivided into Boxes (Burke, 2003)
Figure 8 House project WBS as text indents. (Burke, 2003)
Figure 9: Activity on node
Figure 10: Activity on arrow
Figure 11: Example of critical path method
Figure 12 Cross section of quay wall
Figure 13: Cross section of wave breaker
Figure 14: Floorplan of terminal
Figure 15: Control Tower Floorplan
Figure 16: Floorplan of stand - shops - WC
Σκοπός της παρούσας έρευνας, που αναπτύσσεται με βάση την ολοκλήρωση μιας μεταπτυχιακής εργασίας, είναι η αξιολόγηση και η ελαχιστοποίηση των επιπτώσεων από τον απρόβλεπτο χρόνο και τους οικονομικούς παράγοντες κατά τη φάση κατασκευής ενός τεχνικού έργου. Τέτοιοι απρόβλεπτοι παράγοντες είναι η απρόβλεπτη κατάσταση του εδάφους, τα αρχαιολογικά έργα, οι αλλαγές στους στόχους του έργου, η εφαρμογή της προβληματικής μελέτης κλπ. Η σπουδαιότητα αυτής της έρευνας είναι η κατηγοριοποίηση των προβλημάτων που εμφανίζονται κατά τη φάση κατασκευής, η διαμόρφωση πιθανών λύσεων για την ελαχιστοποίηση των αρνητικών επιπτώσεων, χρησιμοποιώντας μια μελέτη περίπτωσης (το τεχνικό έργο του νέου λιμανιού της Πάτρας). Τέλος, η σύγκριση της τρέχουσας κατάστασης στην Ελλάδα αναλύεται, σύμφωνα με τις καθυστερήσεις των τεχνικών έργων, βάσει διεθνούς βιβλιογραφικής ανασκόπησης.
The aim of the present research, which is developed on the basis of the completion of a Master Thesis, is to evaluate and minimize the impacts from the unpredictable time and financial factors during the construction phase of a technical project. Such unpredictable factors are the unexpected ground condition, archaeological works, changes on the project’s targets, problematic study’s application etc. The importance of this research is the categorization of the occurring problems during the construction phase, the formulation of possible solutions for the minimization of the negative impacts, using a case study (the technical project of the new harbor of Patras). Finally, a comparison of the current condition in Greece is analyzed, according to the delays of technical projects, on the basis of an international literature review.
Items in Apothesis are protected by copyright, with all rights reserved, unless otherwise indicated.
Κύρια Αρχεία Διατριβής
H χρήση των χρονοδιαγραμμάτων σε κατασκευαστικά έργα στην Ελλάδα - Identifier: 89771
Internal display of the 89771 entity interconnections (Node labels correspond to identifiers)